Structural investigation, design of repairs included repair and jacking of two columns, selective demolition and replacement of approx. 100,000 SF of concrete slabs & structural modifications to inlet & overflow structures in a 40M gallon reservoir in three phases (investigation, emergency repairs and general repairs & modifications).

 
 
  • Robert Navarro & Associates Engineering, Inc.
  • 124 W. Castellano Drive, Suite 201, El Paso, TX 79912