E-15 Elementary School for the El Paso Independent School District – 2008-2010 with Moore Nordell Kroeger Architects, Inc. This project include the structural design for 3277 student 113577 SF 2-story, multilevel elementary school constructed in rocky soils at the foot of the Franklin Mountains on the side of El Paso using a combination of spot and spread footings supporting a steel frame with CMU bearing walls, steel bar joist and metal deck roof structure.